author | zecke <zecke> | 2002-10-18 03:12:54 (UTC) |
---|---|---|
committer | zecke <zecke> | 2002-10-18 03:12:54 (UTC) |
commit | 07a1cb4baaf544e0e594040bbe8e5872ccb34c0f (patch) (side-by-side diff) | |
tree | ba556d2f587a65bfc3b15fc844a9383f5ef66c9e /noncore/apps/opie-console | |
parent | 86b3550348cf896b568e98d21da577c3f35a1a4a (diff) | |
download | opie-07a1cb4baaf544e0e594040bbe8e5872ccb34c0f.zip opie-07a1cb4baaf544e0e594040bbe8e5872ccb34c0f.tar.gz opie-07a1cb4baaf544e0e594040bbe8e5872ccb34c0f.tar.bz2 |
Fix the behaviour of isOverDue.
We currently check if the Record got a DueDate
and then do some calculations.
I added a check to see if the item isCompleted.
If it is completed it can not be overdue
Stefan: Only one item left which is overdue ;)
0 files changed, 0 insertions, 0 deletions